HMP Highlands
Main Contractor: Balfour Beatty
Tonnage: 1,000t
Value: 3.75million
Scope of Works:
BSB supplied and erected the Steelwork, Metal Decking. & Edge Protection. We also installed the pre-cast stairs & internal security walls. The full frame was intumescent painted to 60 minutes with stair cores.

 
		 
		 
		 
		 
		 
		




